Safer Isolations & Commissioning.
‍
Energise With Confidence

Know what is live, isolated and safe to work on.
Validate switching and LOTO before equipment is operated.
Give non-electrical teams a simple room and panel view of energisation.
Safer
Simulate switching and isolations
Live
One view of energisation status
Faster
Critical information always at hand
Visible
Make electrical state clear to all
The Commissioning Problem
During energisation and commissioning, the electrical network is evolving while construction continues around it. Teams need to know the current state, not what a drawing showed when it was issued.
Tacit Knowledge Isn't Shared
A few SAPs or Enegry Marshals often know what is energised while the wider project relies on calls, messages and spreadsheets.
Manual Impact Assessment
Teams trace multiple drawings to understand what a switching action will affect upstream and downstream.
LOTO Changes the Picture
When an isolation is implemented, the live electrical picture changes, but separate documents and status boards may not.
What PlantQuest Changes
See Energisation Live
Know which equipment, panels and rooms are energised, isolated or impacted at that moment.

‍
Plan Before You Switch
Simulate breaker operations and verify expected impact before anyone operates equipment in the field.

‍
LOTO Updates the Model
Record isolation and lock state against the relevant device so the connected electrical picture reflects the implemented LOTO.

‍
Make Power Status Visible
Project electrical state onto an interactive  map that construction, fabric trades, cleaners and the client can understand.

‍
Coordinate Commissioning
Keep electrical and commissioning status together, reducing status chasing and helping teams coordinate concurrent work.

‍
Carry It Into Operations
Hand over a structured electrical model instead of losing commissioning knowledge at project completion.

‍
A Safer Commissioning Workflow
Plan - Validate - Switch - Broadcast - Handover
01
Plan
Build the intended switching or isolation sequence.
02
Validate
Check downstream impact effects and impact.
03
Execute
Update electrical and lock state as work occurs.
04
Broadcast
Roll status up to rooms, panels and project to screens.
05
Handover
Retain a structured model for ongoing operations.
Not Just For Electrical Specialists
Make Energisation Status Clear to Everyone Working on Site.
A cleaner, logistics team or fabric contractor should not need to read an SLD to understand whether a room is live. Electrical state can be translated into simple room and panel status and shared across the project.
Commissioning Managers
One view of electrical state and CX progress.
SAPs / Electrical Teams
Simulate switching and validate isolation impact.
EHS / LOTO Owners
See locks, isolation points and safe-to-work state.
Construction Trades
Understand room energisation without interpreting SLDs.
Project Proof
Applied on Hyperscale
Data-Centre Programmes
Real-Time Energisation Visibility for Live Commissioning
SLD Studio gives commissioning and LOTO teams at one of the United States’ leading data centre contractors live visibility of electrical energisation status across major data centre construction projects nationwide.
Live Electrical Commissioning for a 48MW Data Centre
PlantQuest SLD Studio turned static SLDs into a live electrical model for a 48MW Finnish data centre, supporting switching, isolation and commissioning planning.
Powered by SLD Studio
See the product behind the workflow.
Explore how SLD Studio digitises, connects and simulates the electrical model that underpins this commissioning workflow.